|
REFERENCE
|
ISSUE DATE
|
STATUS
|
MODELS
|
SUBJECT
|
COMPLIANCE
|
| SB124 |
5 Dec 2006 |
MANDATORY |
CT2K Upto Serial 8124 |
Flap Up limit Cable |
Before Further Flight |
| SB123 |
23 Feb 2007 |
MANDATORY |
CT2K & CTSW before 22 Feb 2007 |
Main Landing Gear |
See Bulletin |
| SB122 |
10 July 2006 |
MANDATORY |
Quik Upto S/N 8184 |
Wing Keel |
Within 5 Flying Hours |
| SB121 |
10 July 2006 |
RECOMMENDED |
All Quantum 912 & Quik Aircraft |
Cooling System |
Before Further Flight |
| SB120 |
26 July 2005 |
MANDATORY |
Quik Upto S/N 8037 |
Wing Uprights |
Within 5 Flying Hours |
| SB119 |
6 Jan 2005 |
MANDATORY |
CT2K before 17/6/03 |
Nose Wheel |
Before Further Flight |
| SB118 |
2 Sept 2004 |
MANDATORY |
Quant912 and Quik 912/912S |
Oil Hose |
Before Further Flight |
| SB117 |
14 May 2004 |
COMPULSORY |
Quantum and Quik |
Pylon Hang point bush |
Within next 5 hours |
SB116 (Issue 2) |
23 Sept 04 |
MANDATORY |
Pegasus Quik up to S/N 8070 |
Control Frame Top Rivet |
Before Further Flight |
| SB115 |
3 Aug 2004 |
MANDATORY |
CT2K |
Internal Aileron & Flap Bracket |
Within next 5 hours |
| SB114 |
25 June 2003 |
COMPULSORYY |
Pegasus Quik up to S/N 7966 |
Kingpost Base |
Before Further Flight |
| SB113 |
28 April 2003 |
MANDATORY |
Pegasus Quik 912S upto S/N 7951 |
Front Engine Mount Spacer |
Within next 25 hours |
| SB112 |
|
COMPULSORY |
Pegasus Quik up to S/N 7932 |
Quik Trim Cord |
Quik Trim Cord |
| SB111 |
17 Jun 2002 |
COMPULSORY |
Quantum Quasar & Booster Mk 1 with primer bulbs |
Primer bulb blockage |
Within next 25 hours |
| SB110 |
28 Mar 2002 |
ADVISORY |
AX2000 & AX3 |
Lift strut tangs, bolts and main axis cable |
Optional |
| SB109 |
21 Mar 2002 |
OPTIONAL |
All Pegasus flexwing aircraft |
Component life extension |
Optional |
| SB107 |
27 Jul 2001 |
COMPULSORY |
CT |
Door latches |
Before further flight |
| SB106 |
17 Jul 2001 |
COMPULSORY |
Q & Q2 wings up to Serial No. 7838 |
Luff line triple pulley block rivet |
Before further flight |
| SB105 |
17 Jul 2001 |
ADVISORY |
Quantum |
Pylon fretting |
Recommended within 50 hours |
| SB104 |
17 Jul 2001 |
COMPULSORY |
All Pegasus & Cyclone Airsports aircraft |
Fuel hose dis-bonding |
Within next 25 hours |
| SB102 |
25 Jun 2001 |
COMPULSORY |
Quantum 912 |
Rotax 912 engine crank case inspection |
Within next 25 hours |
| SB103 |
14 Jun 2001 |
STRONGLY RECOMMENDED |
Booster |
Side cable stops |
Before next flight |
| SB101 |
14 Jun 2000 |
COMPULSORY |
Quantum 912 |
Rotax 912 engine valve collar replacement |
Various, see bulletin |
| SB100 |
1 Nov 2000 |
COMPULSORY |
Quantum’s built in period 1998 to end 2001 |
Fuel tank straps |
Compulsory |
|
|
22-Feb-00
|
ADVISORY
|
Quantum HKS & AX2000 HKS
|
HKS starting procedure
|
Optional
|
|
|
18-Nov-99
|
COMPULSORY.
|
All AX3’s
|
Throttle torque tube & levers
|
Within next 50 hours
|
|
|
30-Jun-99
|
OPTIONAL
|
AX2000
|
Increase in MAU Weight
|
Optional
|
|
|
15-Jun-99
|
OPTIONAL
|
AX2000 HKS
|
Slotted centre section cover
|
Optional
|
|
|
06-May-99
|
COMPULSORY
|
Quantum 912
|
Rotax 912 stators to change
|
Before next flight
|
|
|
27-Jan-99
|
COMPULSORY
|
All AX3 variant and AX2000
|
Wing tip inspection
|
Before further flight then at 50 hour intervals
|
|
|
04-Jan-99
|
MANDATORY
|
All AX2000's
|
Throttle lever shorten & replace throttle stops
|
Within the next 50 hours
|
|
|
26-Aug-98
|
MANDATORY
|
Q2 and Bandit wings
|
Q2 and Bandit wing tip inspection
|
Inspection before further flight
|
|
|
19-Aug-98
|
MANDATORY
|
All AX3's and AX2000's
|
AX2000/AX3 rudder bolt lifing
|
AX3 < 1000 hours: inspection before further flight: AX3 > 1000 hours: replace parts before further flight. AX2000: Before further flight
|
|
|
12-Aug-98
|
COMPULSORY
|
Block - Scandal XK. Sail screw - all Solar Wings hang gliders
|
Hang Glider Leveller Block and Keel Sail Screw
|
Inspection before flight
|
|
|
30-Jul-98
|
COMPULSORY
|
Pegasus Aircraft serial numbers: 7428, 7435, 7438, 7440, 7445, 7446, 7447, 7449, 7450, 7454, 7455, 7456
|
Seatbelt buckle failure to release under load
|
Buckle operation must be checked before further flight
|
|
|
06-Jul-98
|
COMPULSORY
|
All AX2000's
|
AX2000 exhaust support bolt, AX2000 trim tab horn, steering links
|
Inspect before flight, action within 25 hours or if inspection proves unsatisfactory, before further flight.
|
|
|
18-Jun-98
|
ADVISORY
|
All Pegasus aircraft powered by the ROTAX 912 engine
|
Notes on Rotax Service Bulletin 18 U1 97 R-1 D/E (Use of Avgas)
|
|
|
|
16-Jun-98
|
COMPULSORY
|
All AX2000 aircraft powered by Rotax engines.
|
AX2000 power supply isolation
|
Within next 25 hours
|
|
|
07-May-98
|
ADVISORY
|
Scandal XK, Serial numbers up to 7436
|
Scandal XK Hang Glider Roll Handling
|
Before further flight if roll handling is poor.
|
|
|
07-Apr-98
|
Strongly advised
|
Cyclone AX2000 aircraft only
|
AX2000 Undercarriage Rotation
|
Optional
|
|
|
|
Not Issued
|
|
|
|
|
|
06-Apr-98
|
ADVISORY
|
All Pegasus Q2 wings and Quasar-Q1 wings
|
Quasar-Q1 and Q2 Roll Bearing Cracking
|
Within the next 25 hours and subsequently after heavy and strong cross wind landings.
|
|
|
26-Mar-98
|
COMPULSORY
|
AX2000 aircraft, reg. G-MZER, G-MZLM and G-MZHR
|
AX2000 Tow line
|
Before further flight
|
|
|
|
Not Issued
|
|
|
|
|
|
23-Sep-97
|
MANDATORY
|
All Ax3's and AX2000's
|
AX-3 and AX2000 Aileron Control System, Aileron Return Pulley Bracket, Batten Extraction loops.
|
Within Next 25 hours for aircraft that have completed more than 200 flights or 400 hours.
|
|
|
17-Sep-97
|
COMPULSORY
|
All Pegasus Q and Q2 wings
|
Securing of Q and Q2 roll bearing bolt
|
Before next flight
|
|
|
17-Sep-97
|
COMPULSORY
|
All Pegasus Quantum trikes
|
Quantum over-centre catch - pin sideways movement.
|
Before next flight
|
|
|
15-Sep-97
|
Strongly advised
|
All Pegasus Q2 wings
|
Inspection of Q2 trim bridle cables
|
Within next 25 hours
|
|
|
20-May-97
|
Strongly advised
|
All Pegasus Rigging Cables
|
Inspection of rigging swaging
|
Before next flight
|
|
|
15-May-97
|
MANDATORY
|
All Pegasus and Solar Wings XL wings.
|
Lifing and redesign of leading edge bolt assembly
|
Within 100 hours or 300 flights (whichever is least)
|
|
|
17-Feb-97
|
COMPULSORY
|
AX2000, First three production aircraft, reg. G-MZFA, G-MZGC and G-MZER
|
AX2000 Batten Pocket closures
|
Before further flight.
|
|
|
31-Jan-97
|
COMPULSORY
|
First three production aircraft, reg. G-MZFA, G-MZGC and G-MZER
|
AX2000 Batten pocket closures and AX2000 Joystick limit cable
|
Before further flight
|
|
|
06-Nov-96
|
Strongly advised
|
All Pegasus Quasar and Quantum range
|
Inspection and replacement of front fork trailing links
|
Before next flight
|
|
84 Issue: 1
|
18-Sept-96 |
|
All Q2 Wings Quantum & Quasar |
Inspection Of Sail Stitching |
Before next flight |
|
|
06-Jun-96
|
MANDATORY
|
All AX3's
|
Main Beam Fatigue Failure
|
Before next flight
|
| 82 Issue: 2 |
08-Jan-96 |
MANDATORY |
All Quantums |
Quantum Rear undercarriage |
Before next flight |
|
|
29-Jan-95
|
Strongly advised
|
All AX3's
|
Throttle Icing
|
|
|
|
20-Apr-93
|
Strongly advised
|
AX3's from 1.1.93, serial Nos CA/C2103068 to 73 and CA/C3013085
|
Saddle spacers
|
|
|
|
20-Apr-93
|
Strongly advised
|
All AX3's serial Nos CA001 - CA002 - CA/C2083047 to 51 CA/C2103068 to 73
|
Magneto Switches
|
|
|
|
30-Jan-93
|
Strongly advised
|
All AX3's serial Nos. CA/C2083047 to 51 & CA/C2103070, 71 & 73
|
Fuel pump drain
|
|
|
|
|
Not Issued
|
|
|
|
|
|
25-Jan-93
|
Strongly advised
|
Aircraft Serial numbers CA/C2083047 to 51 & CA/C2103070, 71, 73
|
Fuel tank drain outlet
|
Before the next flight
|